SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
6-14 – JLG Lift – 3121214
3. The tightening of the nuts should be done in stages. Fol-
lowing the recommended sequence, tighten nuts per
wheel torque.
4. Wheel nuts should be torqued after first 50 hours of
operation and after each wheel removal. Check the
torque after the first 10 miles, 25 miles, and again at 50
miles. Check periodically thereafter.
6.6 SUPPLEMENTAL INFORMATION
The following information is provided in accordance with the
requirements of the European Machinery Directive 2006/42/
EC and is only applicable to CE machines.
For electric powered machines, the equivalent continuous A-
Weighted sound pressure level at the work platform is less
than 70dB(A)
For combustion engine powered machines, guaranteed
Sound Power Level (LWA) per European Directive 2000/14/
EC (Noise Emission in the Environment by Equipment for
Use Outdoors) based on test methods in accordance with
Annex III, Part B, Method 1 and 0 of the directive, is 104 dB.
The vibration total value to which the hand-arm system is
subjected does not exceed 2,5 m/s
2
. The highest root mean
square value of weighted acceleration to which the whole
body is subjected does not exceed 0,5 m/s
2
.
Ta b l e 6 - 1 2 . W h e e l To r q u e C h a r t
TORQUE SEQUENCE
1st Stage 2nd Stage 3rd Stage
40 ft lbs (55 Nm) 95 ft lbs (130 Nm) 170 ft lbs (230 Nm)