Jlg E300 Operator Manual Manuel d'utilisateur Page 55

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 92
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 54
SECTION 4 - MACHINE OPERATION
3121252 – JLG Lift – 4-11
Swinging the Boom
To swing boom, use Swing control to select Right or Left
direction.
Raising and Lowering the Upper Boom
To raise or lower the Upper Boom, position Upper Boom Lift
switch to Up or Down until desired height is reached.
4.8 FUNCTION SPEED CONTROL
This control affects the speed of boom functions and plat-
form rotate Lift, Telescope, and Swing. When in the fully
counterclockwise position, Drive is placed in creep speed.
4.9 SHUT DOWN AND PARK
NOTE: When parking battery powered units overnight, batteries
should be charged in accordance with instructions in
Section 6 to ensure readiness for following workday.
NOTE: Electric machines are equipped with a static strap due to
static electricity build-ups. Strap is located under rear of
machine chassis.
The procedures to shut down and park the machine are as
follows:
1. Drive machine to a reasonably well protected area.
2. Ensure boom is lowered over rear drive axle.
Vue de la page 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 91 92

Commentaires sur ces manuels

Pas de commentaire