Section 4 - Operation
4-931200567
Placing a Suspended Load
Before placing any load be sure that:
The landing point can safely support the weight of the load.
The landing point is level; front to back and side to side.
Use the capacity chart to determine safe boom extension range. See “Use of the
Capacity Chart” on page 5-3.
Align load at the level load is to be placed, then position boom slowly until load is
just above area where it is to be placed.
Ensure that the guide men and operator remain in constant communication
(verbal or hand) when placing the load.
Disengaging a Suspended Load
Never place the guide men between the suspended load and the telehandler.
Once at the destination of the load, ensure to bring the telehandler to a complete
stop and apply the park brake prior to disengagement of the lifting devices and
tethers.